
Soldier Field Renovation
Chicago, IL
HOIST SERVICES

Rack & Pinion Hoists
Personnel and material hoists sold, rented, and installed for high-rise and heavy civil work

Hoist Service
Inspections, preventive maintenance, and 24/7 emergency repair to keep crews moving

Installation & Jumping
Mast erection, tie-ins, and climbs performed by certified USA Hoist crews

Parts & Training
Genuine replacement parts and operator training for safe, compliant hoist operation
LOCATION
Chicago, IL
SERVICE TYPE
Stadium
EQUIPMENT
Rack & Pinion Hoists, Hoist Service
A Stadium Rebuilt in Record Time
Built in 1924 on Chicago's picturesque lakefront, the old Soldier Field had grown antiquated. The 1,441,000-square-foot stadium was scheduled for completion in a record 20 months, even though a typical stadium requires 30 months or more.
Infrastructure work started in July 2001, six months before the Bears' last game of the season. Early phased work included rerouting sewers, water, and power, and building two major electric vaults. By the Bears' final game on Jan. 20, 2002, power had been rerouted through new underground utilities across the 92-acre site. Construction of the new stadium launched at 12:01 a.m. on Jan. 21.
Project Highlights:
- 1,441,000 square feet on a 92-acre lakefront site
- Record 20-month schedule versus a typical 30+ months
- Construction launched the morning after the Bears' final 2002 game
- Rack and pinion personnel and material hoists installed and serviced by USA Hoist
When it comes to installation and service of standard rack and pinion hoists, USA Hoist is the team contractors trust on schedule-critical landmark projects.
PROJECT GALLERY

USA Hoist rack and pinion hoists supporting the Soldier Field renovation
EQUIPMENT USED
Rack & Pinion Hoists
Standard rack and pinion personnel and material hoists supplied and installed by USA Hoist to move crews and materials throughout the stadium build.
Hoist Service
Ongoing inspections, preventive maintenance, mast jumps, and emergency repair from USA Hoist technicians for the life of the project.
Start a Project Like This
Get started with a similar architectural railing solution for your project.
Reference: Soldier Field Renovation
"On a 20-month schedule there is no room for a hoist to go down. USA Hoist had our crews and materials moving from day one, and their service team kept every car running through the final pour."
TECHNICAL DOCUMENTATION
Spec Sheets
INTERESTED IN A SIMILAR PROJECT?
Contact USA Hoist to plan hoist sales, rental, installation, and service for your next job.


